saman
Ƙa'idar aiki na sauya wutar lantarki mai yanke dual

 

Ka'idar aiki na STS ta dogara ne akan buƙatar sauyawar wutar lantarki. Lokacin da babbar wutar lantarki ta kasa ko ta kasa, STS can automatically switch the load from the main power supply to the backup power supply to maintain continuous power supply. The main steps include: 1 Monitoring: STS will continuously monitor the status of the main power supply, including parameters such as voltage, mita, phase, da dai sauransu. 2. Fault detection: When STS detects a fault in the main power supply or does not meet the preset working range, it will immediately respond. 3. Switching decision: STS determines whether power switching is necessary based on the fault detection results. 4. Switching operation: If it is determined that switching is necessary, STS will control the switching process. It will disconnect the main power supply and ensure that the backup power supply is ready, then connect the load to the backup power supply. 5. Switching completed: Once the switching is completed, STS will monitor the status of the backup power supply to ensure it can provide power normally. Collaboration with UPS

Bar Amsa

Ba za a buga adireshin imel ɗin ku ba. Ana yiwa filayen da ake buƙata alama *

Yi taɗi da kristi
riga 1902 saƙonni

  • Kirista 10:12 AM, Yau
    Na yi farin cikin karɓar saƙon ku, kuma wannan shi ne martanin Kirista a gare ku